Shutdown point diagram
When a firm in perfect competition should keep producing at a loss and when it should shut down: price against the lowest point of average variable cost.
Open this scenario in CueCurve
Included in the school licence.
What the diagram shows
In the short run a firm has fixed costs it must pay whether it produces or not. So it keeps producing, even at a loss, as long as price covers average variable cost: each unit then contributes something towards the fixed costs. The shutdown point is the lowest point of AVC.
If price falls below minimum AVC, every unit adds to the loss, so the firm should stop producing and lose only its fixed costs. That's why the firm's short-run supply curve is its MC curve above AVC. In the long run, a firm that can't cover average total cost leaves the industry.
Two scenarios
Drawing it in an exam
- Draw MC cutting both AVC and AC at their lowest points, with AVC below AC and the gap narrowing as output rises.
- Mark the shutdown point where price equals the lowest AVC, and shade the loss between AC and price.
- Say the firm's short-run supply curve is MC above AVC.
- A common slip is putting the shutdown point at the lowest point of AC, which is the long-run break-even point instead.
Your exam board
Choose your board to see where this sits in its specification and what its mark schemes look for.
Edexcel A
- Specification
- 3.3.4 Short-run and long-run shutdown points.
- What its mark schemes look for
- Examiners keep asking for diagrams that are accurately drawn, fully labelled and used in the answer, and a top-level essay often needs an accurate diagram.
Edexcel B
- Specification
- We haven't recorded the exact specification point for this board yet.
- What its mark schemes look for
- A diagram on its own earns at most 4 of 6 marks: the answer has to explain it. Diagrams should be fully labelled, with the original equilibrium shown.
AQA
- Specification
- We haven't recorded the exact specification point for this board yet.
- What its mark schemes look for
- Short Draw questions are marked by counting labels: both axes, every curve, and the prices and quantities. No title or grid lines are needed.
OCR
- Specification
- We haven't recorded the exact specification point for this board yet.
- What its mark schemes look for
- Diagram marks are listed point by point: axes labelled, curves labelled with the right shift, and the old and new equilibrium marked.
Eduqas
- Specification
- We haven't recorded the exact specification point for this board yet.
- What its mark schemes look for
- The top bands reward a diagram that is accurate, well labelled and referred to in the writing. A diagram that isn't used drops a band.
WJEC
- Specification
- We haven't recorded the exact specification point for this board yet.
- What its mark schemes look for
- Axes must be labelled for the market in the question, and a question that asks for 'diagrams' expects more than one.
Cambridge International
- Specification
- 7.6.4 Output, profits and the shutdown price in each market structure.
- What its mark schemes look for
- The shape needn't be exact, but slopes must go the right way, curves that should meet must meet, and every curve and axis needs a label.
Edexcel International
- Specification
- 3.3.2 and 3.3.3 Short-run and long-run shutdown points.
- What its mark schemes look for
- Draw questions give a mark for labelled axes and the original curves, then marks for the change and the new price and quantity. The diagram alone can earn every mark.
With a school licence, the How often page in CueCurve lists the exam questions each board has asked that call for this diagram.
Paraphrased from published specifications, mark schemes and examiner reports. How we check
In CueCurve you can also
- Build the diagram line by line in front of the class with Step by step, so they see the order to draw it in.
- Drag the curves live and switch scenarios in one click, starting from the plain diagram each time.
- Present it full screen, draw on it with the pen, and save it into a lesson.