When a firm in perfect competition should keep producing at a loss and when it should shut down: price against the lowest point of average variable cost.

Shutdown point: a firm with MC, AC and AVC; price P1 = AVC1 at the lowest point of AVC, output q1, and the loss per unit between AC1 and P1 shaded.

Open this scenario in CueCurve

Included in the school licence.

What the diagram shows

In the short run a firm has fixed costs it must pay whether it produces or not. So it keeps producing, even at a loss, as long as price covers average variable cost: each unit then contributes something towards the fixed costs. The shutdown point is the lowest point of AVC.

If price falls below minimum AVC, every unit adds to the loss, so the firm should stop producing and lose only its fixed costs. That's why the firm's short-run supply curve is its MC curve above AVC. In the long run, a firm that can't cover average total cost leaves the industry.

Two scenarios

Drawing it in an exam

Your exam board

Choose your board to see where this sits in its specification and what its mark schemes look for.

Edexcel A

Specification
3.3.4 Short-run and long-run shutdown points.
What its mark schemes look for
Examiners keep asking for diagrams that are accurately drawn, fully labelled and used in the answer, and a top-level essay often needs an accurate diagram.

Edexcel B

Specification
We haven't recorded the exact specification point for this board yet.
What its mark schemes look for
A diagram on its own earns at most 4 of 6 marks: the answer has to explain it. Diagrams should be fully labelled, with the original equilibrium shown.

AQA

Specification
We haven't recorded the exact specification point for this board yet.
What its mark schemes look for
Short Draw questions are marked by counting labels: both axes, every curve, and the prices and quantities. No title or grid lines are needed.

OCR

Specification
We haven't recorded the exact specification point for this board yet.
What its mark schemes look for
Diagram marks are listed point by point: axes labelled, curves labelled with the right shift, and the old and new equilibrium marked.

Eduqas

Specification
We haven't recorded the exact specification point for this board yet.
What its mark schemes look for
The top bands reward a diagram that is accurate, well labelled and referred to in the writing. A diagram that isn't used drops a band.

WJEC

Specification
We haven't recorded the exact specification point for this board yet.
What its mark schemes look for
Axes must be labelled for the market in the question, and a question that asks for 'diagrams' expects more than one.

Cambridge International

Specification
7.6.4 Output, profits and the shutdown price in each market structure.
What its mark schemes look for
The shape needn't be exact, but slopes must go the right way, curves that should meet must meet, and every curve and axis needs a label.

Edexcel International

Specification
3.3.2 and 3.3.3 Short-run and long-run shutdown points.
What its mark schemes look for
Draw questions give a mark for labelled axes and the original curves, then marks for the change and the new price and quantity. The diagram alone can earn every mark.

With a school licence, the How often page in CueCurve lists the exam questions each board has asked that call for this diagram.

Paraphrased from published specifications, mark schemes and examiner reports. How we check

In CueCurve you can also